CO129-513-6 Hong Kong water supply- schemes for development and improvement 25-1-1929 - 2-8-1929 — Page 4

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All

the Chrten scheme Bet be taken

in hand_ M 12/2

Jes. Clearly

we must five covering

4

approval for

the Reneword which has

Beel when this has ought. we should consider whether we

already been started.

Sone

to consult the 0.DC. about the pipe.

live.

G.G.

4.1.25

aeol

2 Ill to Gov. Hong Kong.

4

march 1920

3 To CA (w/ Duster afstand 72/2)

13/3/29

4. Ger. Tel.

11.3.29

Date of Henderson's Anival.

Mr. Henderson will not be here for

over a month and we cannot do very much more

until he arrives.

In the meanwhile the

Secretary, O.D.C. should see the papers as

proposed above.

I do not think that Major Macready

will consider any formal consultation of the

0.D.C. necessary as to the Harbour Pipe Line. They were of opinion (see memorandum in 52944) that

the Pipe Line should be constructed, and it is

desirable from a defence point of view that it

should